madtaco461
BRO-runner
Super Tech. best oil hands down
Caster oil
AMS/RP/Lucas all seem kinda snake-oil-ish to me. They work, lots run it, myself included (used RP and AMS for the Acura) but honestly any good full synthetic and liqui moly or ceratec additions will get you a long long ways. if you need performance then that's a whole other animal. Taco gets full synthetic Mobil1, extra capacity Purolator filters and liqui moly ceratec every other10k oil change. Never had a problem and haven't had premature fouling. I check it every time I fill up if I can.
So the architect showed up, saw our wall framing, said it was wrong, we said it wasn't, she walked over to the plan table, looked at the details on the prints, said "huh, guess I copied these from an old print. . Yeah no it's wrong, it'll have to come down", and took off.
I fucking hate architects.
So the architect showed up, saw our wall framing, said it was wrong, we said it wasn't, she walked over to the plan table, looked at the details on the prints, said "huh, guess I copied these from an old print. . Yeah no it's wrong, it'll have to come down", and took off.
I fucking hate architects.
So the architect showed up, saw our wall framing, said it was wrong, we said it wasn't, she walked over to the plan table, looked at the details on the prints, said "huh, guess I copied these from an old print. . Yeah no it's wrong, it'll have to come down", and took off.
I fucking hate architects.
Sounds like job security to me . Cha ching$$$Whatever man. If she's on revision 2 and only supplied you with rev 1 then just bill for the time and material. It's not uncommon and you know that. Then get rev 2 in hand and do it all again. The project I'm on is in rev 7. Yep. 7 fucking revisions for a residential addition. It's been pretty funny running this shit show. lol
Best job I was on was rev 21 before the job even startedWhatever man. If she's on revision 2 and only supplied you with rev 1 then just bill for the time and material. It's not uncommon and you know that. Then get rev 2 in hand and do it all again. The project I'm on is in rev 7. Yep. 7 fucking revisions for a residential addition. It's been pretty funny running this shit show. lol
Thought you were a landscaperI'm my own architect.
Hashtag that buildings not crooked, that's abstract art.
Eh tomato potatoThought you were a landscaper
Eh tomato potato
Whatever man. If she's on revision 2 and only supplied you with rev 1 then just bill for the time and material. It's not uncommon and you know that. Then get rev 2 in hand and do it all again. The project I'm on is in rev 7. Yep. 7 fucking revisions for a residential addition. It's been pretty funny running this shit show. lol
EhJust because it has a penis doesn’t mean it’s not a girl
Thought you were a landscaper
Must of took biology at a California schoolJust because it has a penis doesn’t mean it’s not a girl